Construction journal: shower trim installed!
The grab bar and shower hardware are in too.
Now to get the construction grime cleaned up. There’s a reason I’m not showing the pan.
You didn’t want to watch me on the ladder juggling screw drivers, boards, caulk guns, etc.
I have two days to turn my workshop into a bedroom fit for an 18 month old (and her parents).
I will be doing a lot of stairs, storing equipment in the basement.
My planned schedule got delayed a bit due to Irene going to the ER with a bowel obstruction on Sunday. I got her out today. The 4 hours on Sunday and 5 hours today (and daily trips to the hospital in between) ate into my work time. Michael, having only one working foot, isn’t eligible to drive, or to stand on ladders. He continues to make fabulous bread though!
The ladies know who bakes their bread.
The weather gods have blessed me with warm weather and scant snow.
The crystals formed overnight between warm days, until the nights were warm too.
We are hoping for snow on Christmas Eve, so the Grand Girl will have a chance to use her new sled.
We will cut a Christmas tree when the Girl arrives so she can help decorate ours too.