Construction journal: we have a floor

And we are thrilled.

John began by laying down vapor barrier and then started installing white oak on November 9.

By November 10, he had all the wood down.

By the 11th, he had the step constructed and the floor sanded. We left on Thursday, when he started finishing the floor.

We stayed at Marcie’s house, as she has a wonderful place to host guests with pets! Michael commuted back to take care of livestock.

The second coat went on Friday, November 13.

He put the final coat on Monday (yesterday) morning, and we moved back into our house. Zeke still isn’t allowed on the floor for a couple more days, but we have enough ways in and out of our house so he can stay here. He just couldn’t be around while the floor finish was wet. It still needs to cure more before we can move furniture back in, but we can tiptoe around in our socks. I still need to do the mop board and install a door in the bathroom. But this is a HUGE step forward!

Thank you Marcie for being a fabulous hostess and for making our lives delightful during what could have been an overly stressful period. We cooked. We explored. We gabbed. We talked fiber. We did chores. We puttered around. Blessings abound!